Conestoga Cold-Storage

Location
Vaudreuil-Dorion, Quebec
Status
Complete
Year Built
2023
Asset Class
Industrial
Conestoga Cold Storage 12 compressed

Broccolini was entrusted by Conestoga Cold Storage to manage the expansion of its Vaudreuil warehouse—Phase 3 of the company’s growing national footprint. Designed and built to exacting standards, the project adds 46,000 sq.ft. of cold storage with a 48-foot clear height, an 8,500 sq.ft. refrigerated loading dock, and a new rooftop mechanical room.

 

Engineered for optimal performance, the facility maintains temperatures between -18˚C and 4˚C, supported by insulated metal panels and energy-efficient cladding. Specialized foundations, including piles and rigid inclusions, were installed to address site conditions and support a jointless slab on grade. Construction began in June 2021 and was completed by February 2023, with racking installation underway by March 2022.

Conestoga Cold Storage 14 compressed

at a glance

46,000 sq.ft.
cold storage expansion
8,500 sq.ft.
refrigerated loading dock
48 feet
clear height
Conestoga Cold Storage 09
Conestoga Cold Storage 04 compressed
Conestoga Cold Storage 06 compressed
Conestoga Cold Storage 02
Conestoga Cold Storage 01
01 /
What’s next? Let’s build it together
Connect with us
Connect with us